CAPABILITIES

From design to finished part, under one roof

One team runs engineering, tooling, prepreg production and quality control. That means speed, consistency and traceability.

ENGINEERING

Right design first

With CAD modeling, 3D scanning and reverse engineering we design parts that fit existing geometry exactly, and validate them with engineering analysis before production.

  • CAD modeling and ply planning
  • Reverse engineering with 3D scanning
  • Engineering analysis
  • Tool design
Part and mold design in CAD

PRODUCTION

Controlled prepreg manufacturing

We lay up prepreg carbon fiber in a controlled environment and cure it on programmed cycles in a vacuum-connected oven. Tooling, finishing and clear coating are all in-house.

  • Composite tooling
  • Prepreg layup and vacuum bagging
  • Out-of-autoclave (OOA) oven cure
  • Trimming, drilling and clear coat
Prepreg carbon fiber layup

PROCESS

Six steps from design to delivery

01

Design and analysis

CAD modeling, reverse engineering with 3D scanning, analysis and ply planning.

02

Tool design and manufacture

Molds are designed from CAD data and made in-house.

03

Cutting and layup

Traceable rolls from cold storage; ply-by-ply layup with intermediate debulking.

04

Vacuum bagging

Release film, breather and bag layers; leak check before cure.

05

Out-of-autoclave cure

Programmed cure in a vacuum-connected oven, with temperature and vacuum logged.

06

Finishing and inspection

Trimming, drilling, clear coat where needed; dimensional checks by 3D scanning.

QUALITY AND TRACEABILITY

A record for every part, from roll to delivery

CheckHowStatus
Material traceabilityRecorded by roll and lotRolling out
Out-time trackingCold-storage in/out logRolling out
Dimensional inspection3D scan measured against CADIn place
Management systemsISO 9001 · ISO 14001 · ISO 45001In place
Aerospace and defense qualityAS9100 and EYDEPPlanned

ROADMAP

Autoclave and new facility

TODAY

Out-of-autoclave prepreg production

  • OOA cure in a vacuum oven
  • ISO 9001 · 14001 · 45001 certified
  • Roll-level material tracking
PHASE 1 · NEAR TERM

New facility and autoclave

  • 400–500 m², three-storey facility
  • Autoclave: Ø2 m × 5 m, 8 bar, 150 °C
  • Clean room, trim room, cold room
PHASE 2 · MEDIUM TERM

Certification and series production

  • AS9100 and EYDEP certification
  • Aerospace-grade series production
  • Non-destructive testing capability

Have a part in mind? Let’s build it together.

Get in touch